Stoke-On-Trent Aquaboost Installation

Stoke-On-Trent Aquaboost Installation

This apartment block in Stoke-on-Trent had an outdated and faulty booster pump set that had completely failed. As a temporary solution, the building was relying on a bypass from another Booster Set, which caused flow issues during peak demand. The old pump had a power...

Pressurisation Unit Replacement – Stratford Hotel

Pressurisation Unit Replacement – Stratford Hotel

We recently replaced a failed Mikrofill Pressurisation Unit with a new Flamco single-pump system at a hotel in Stratford.The existing unit had suffered failed internals and persistent leaks, affecting the system's efficiency. Engineer Andrew Shelley completed the...

3-pump Stuart Turner MAB Bespoke Booster Set Installation

3-pump Stuart Turner MAB Bespoke Booster Set Installation

This is a job we really want to shout about as it represents everything PressBoost is about. We recently got called to this large hotel as the existing 4-pump set had been water damaged in the recent flooding in the North West. When we attended site, we found all 4no....

Mikrofill Maxi Installation at Welsh University

Mikrofill Maxi Installation at Welsh University

We recently installed this twin pump Mikrofill Maxi Plus Pressurisation Unit at a large University in Wales. The existing unit had a burnt out pump and caused and outage due to single point of failure. Therefore, we installed this tidy twin pump unit to provide...

Flamco 125 Installation at North West Hospital

Flamco 125 Installation at North West Hospital

We recently installed this Flamco 125 unit to replace a failed and obsolete Mikrofill unit at a local hospital.We opted for the Flamco unit to provide a pumped unit, as we highly recommend this against EFD’s. The Flamco utilises the small space really well and will...

Oldham Hotel – Booster Set Replacement

Oldham Hotel – Booster Set Replacement

We recently visited a hotel / pub from a major chain with a 20+ yr old fixed speed set and vessel which required a written scheme of examination. We replaced this with a new Stuart Turner Aquaboost VARiFLO twin pump variable speed set, and small GWS pump accumulator...

Sheffield Shopping Centre Booster Set Replacement

Sheffield Shopping Centre Booster Set Replacement

We recently attended this shopping centre in Sheffield where the existing Grundfos home Booster Set had failed.PressBoost Senior Engineer Andrew Shelley replaced the unit with an equivalent unit from Lowara, the Resvari Plus 250 3-4.5 Cat 5 Booster Set.A tidy,...

North West College – Booster Set Replacements

North West College – Booster Set Replacements

This college in the North West was new site for us, and we had to replace two old fixed speed units. One of the units had a failed pump and non-return valves causing the remaining working pump to run constantly even when no demand was present. PressBoost engineers Ben...

Birmingham Hotel – Booster Unit Replacement

Birmingham Hotel – Booster Unit Replacement

We recently attended this hotel in Birmingham, where the existing fixed speed Booster Unit had failed and had stopped delivering pressurePressBoost engineer Carl Rogerson installed a new Ebara E-SPD Twin Pump Variable Speed Booster and GWS Pressure Vessels.All...

North West Hospital Grundfos PHT Installation

North West Hospital Grundfos PHT Installation

We recently worked at this hospital in the North West who had a failing, obsolete unit with failed pumps.The unit was replaced with a new Grundfos PHT Pressure Unit giving the site a reliable solution for years to come.Full installation completed to a high standard by...

H-Line Installation – Nuneaton Leisure Centre

H-Line Installation – Nuneaton Leisure Centre

This is a recent Dynamic H-Line Pressurisation Unit installation at a leisure centre in Nuneaton. The existing Warmac spill and fill was from the early 1980s and had provided amazing longevity. However, the system dynamics had changed, and the existing unit was...

Xylem Booster Set and PureWater GRP Tank Installation

Xylem Booster Set and PureWater GRP Tank Installation

The old fixed speed booster set was down to one pump that was noisy.This was replaced by a Xylem SMB variable-speed Booster Set set which will provide significant energy savings, being more efficient and a much lower kw motor rating. We also replaced the tanks with 2...

RPZ Valve Replacements – Welsh University

RPZ Valve Replacements – Welsh University

Along with our core offering of pressure and booster maintenance, we also specialise in the test, commissioning and installation of RPZ Valves [BA devices]. Following annual testing of the valves pictured these 2x valves failed at this major Welsh university. Given...

North-West University PD-X Installation

North-West University PD-X Installation

PressBoost recently completed this installation at a large North-West university where an existing combined Pressurisation Unit was in need of replacing - the recently launched HL Hydronics PD-X combined Pressurisation Unit and Degasser proving the perfect upgrade as...

Salford Hydrovar X Install

Salford Hydrovar X Install

We recently attended a site in Salford where the existing 3-pump booster set was being maintained by another company and had failed completely. Time was of the essence as this meant the building was temporarily fed by another booster set. Fortunately, we were asked to...

Stuart Turner VARiFLO Install – Prestwich

Stuart Turner VARiFLO Install – Prestwich

Location: PrestwichProperty Type: Apartment BlockINSTALLED: STUART TURNER VARiFLOWe were recently called in to provide an alternative quote at this site close to home in Prestwich, Manchester. The existing unit had been condemned by others and was down to a single...

Xylem Hydrovar X Installation – Gloucester

Xylem Hydrovar X Installation – Gloucester

Here we have a nice 3-pump Xylem Hydrovar X CWB Set installation in Gloucester.Whilst carrying out a PPM visit at this large site in May we found No.1 pump off and U/S, No.3 pump extremely noisy and not delivering, with only No.2 pump fully operational. This coupled...

New HL Hydronics Product Installed at North-West University

New HL Hydronics Product Installed at North-West University

We recently installed this new product from HL Hydronics at a major North-West university. HL Hyrdonics recently launched the PD-X combined Pressurisation Unit and Degasser which we recently tested on a visit to Sweden.Whilst completing a PPM visit at this university...

Stuart Turner MAB North West Library Upgrade

Stuart Turner MAB North West Library Upgrade

Location: North WestProperty Type: LibraryInstalled: Stuart Turner MAB CWBWe recently installed this Stuart Turner MAB CWB Set at a large library in the North West as planned lifecycle upgrade works. The existing unit had come to end of life and this new unit will...

Leisure Centre Booster Set Replacement

Leisure Centre Booster Set Replacement

Location: ManchesterProperty Type: Leisure CentreInstalled: Ebara ESPD Twin PumpWe recently completed this CWB Set upgrade for a local City Council following the failure of the ageing fixed speed booster set on site. This was completed in one working day with minimal...

Expansion Vessel Servicing & Maintenance

Expansion Vessel Servicing & Maintenance

Our engineer Ben Brown recently discovered this vessel had failed and posed a significant risk to the DHW System. As you can see, water is clearly the wrong side of the diaphragm coming out of the Schrader valve. Expansion Vessel servicing and maintenance is critical...

Grundfos MPC-E Installation – Sheffield Office Block

Grundfos MPC-E Installation – Sheffield Office Block

Location: SheffieldProperty Type: Office BlockInstalled: Grundfos HPC-EThis was a recent lifecycle replacement job at an office block in Sheffield. The old unit had an obsolete panel and inverters and also had leaking rubber bellows on suction and delivery. Our...

North West Hospital Pressurisation Unit Replacements

North West Hospital Pressurisation Unit Replacements

Location: North WestProperty Type: HospitalInstalled: Grundfos & FlamcoPictured here are two Pressurisation Unit replacements recently completed for a major North West Hospital.  The first is a standard Pressure Unit replacement after pump failure, followed by a...

Nottingham Hotel – Xylem SMB Booster Set

Nottingham Hotel – Xylem SMB Booster Set

Location: NottinghamProperty Type: HotelInstalled: Xylem SMBDuring an emergency callout to this hotel in Nottingham, we found a 3-pump horizontal booster set in a basement plant room with no sumps in the room. Unfortunately this spelt the end for the existing unit and...

Lifecycle Pressurisation unit Upgrade – Oldham

Lifecycle Pressurisation unit Upgrade – Oldham

Location: OldhamProperty Type: LibraryInstalled: Grundfos PHTWe were recently contacted by this Library in Oldham to complete a large amount of lifecycle works for them. First up, the upgrade of their Pressurisation Unit and Expansion Vessels. The existing Grundfos...

Xylem Hydrovar X installations – Site in Bury

Xylem Hydrovar X installations – Site in Bury

Location: BuryProperty Type: Apartment BlockInstalled: Hydrovar X We completed these 2no. XylemUK GHV Hydrovar X installations to an apartment block in Bury late last year. We completed the installation of the 3-pump set first and site were impressed with the...

Mains Water Conversion to Boosted Supply

Mains Water Conversion to Boosted Supply

Location: ManchesterProperty Type: 8 Storey BuildingInstalled: Hydrovar X This 8-storey building in Trafford Park recently ran out of water to the top two floors due to ever decreasing mains pressure. This caused large scale operational issues on site and as such they...

Twin-Pump Booster Set Installation – Glasgow

Twin-Pump Booster Set Installation – Glasgow

Location: GlasgowProperty Type: HotelInstalled: Hydrovar X We recently completed this smart Xylem Hydrovar X GHV Booster Set installation at a large Hotel in Central Glasgow. The existing pumps were over 30-years old and obsolete. Site were running them until failure...

Calpeda Easymat Installation – Emergency Works

Calpeda Easymat Installation – Emergency Works

We carried out this installation for Hydraclean as emergency works following the complete failure of the existing Cold Water Booster Unit at this site in Stevenage. Fortunately, Hydraclean were able to attend the same day as the failure and install a temporary bypass...

Knowsley – School H-Line Installs

Knowsley – School H-Line Installs

We have been continuing our progress through a group of schools in Knowsley supplying and installing 2no. H-Line Units for their LTHW and CHW systems. These Energy Centres are really quite tight on space and as per previous installs we are having to install 2no. units...