We recently installed this 3-pump Xylem Hydrovar X booster set at a tower block in Salford as part of planned lifecycle works. The existing set was 15 years old and the client decided it was time for replacement. This also ties in with other retrofit works they are...
Uncategorized
Media City – Replacement of Obsolete 3-pump Booster Set
The Xylem HydrovarX booster sets are quite literally flying out at the moment! We installed this set at Media City to replace an obsolete and failing Armstrong set that had caused issues for years. The new set is IE5 rated and one of the leading units on the market....
H-Line Installations – Large Hospital – West Yorkshire
We recently completed this large twin H-Line Project in West Yorkshire. This was our first project for the site, which we have now picked up the Bi-annual maintenance for as well! The existing Pressmain GV100 and SA10 units had served the rest of time and come due for...
Grundfos PHT Installation – Wakefield Leisure Centre
We recently completed the replacement of an outdated analogue pressurisation unit at a leisure centre in Wakefield, upgrading the system to a modern Grundfos PHT digital pressurisation unit. The new installation provides several key improvements over the previous...
Hydrovar X Install – Cotswolds College
We recently completed a lifecycle upgrade at a college in the Cotswolds following a failed control board and ongoing pump issues within the existing system. To restore reliability and improve overall efficiency, we installed a new high-efficiency Xylem Hydrovar X ,...
Ebara EVMS Installation – North West Hospital
This twin pump Ebara EVMS Boosted Set installation was carried out late last year following the total failure of the existing TKS set. We had been advising that the existing set was obsolete for some time, however, eventually the existing set failed completely causing...
Xylem GHV20 Hydrovar X Installation – Wigan
This twin-pump Hydrovar X installation was carried out as emergency works at a hotel in Wigan in late 2025. The existing set initially suffered complete failure before water was restored temporarily and we were asked to quote a full replacement by a new customer. Time...
Preston Court Building: H-Line Installation
We recently installed this H-Line Dynamic Spill and Fill Pressurisation Unit as a replacement for the existing unit which was ageing and had multiple failed components. The H-Line is the ideal, modern spill and fill and turned to by many customers looking to replace...
Grundfos Hydro Solo-E Installation – North West
Working with Hydraclean we recently installed this Grundfos Hydro Solo-E Booster Set as part of Hydraclean's wider upgrade and modernisation of the water system at a Mill in the North West. The Solo comes complete with integral screen on the inverter to allow for...
Manchester School – 3-Pump Variable Speed Booster Replacement
A recent project at a school in the Greater Manchester area involved the replacement of a failing three-pump fixed-speed booster set. With the existing unit close to complete failure, the site required a rapid turnaround to restore consistent water supply. Our team...
Manchester Apartments – Ebara ESPD Booster Installation
At a residential apartment block in Manchester, we recently upgraded an old, obsolete booster set with a new three-pump Ebara ESPD variable speed booster set. As part of the installation, we also modified the suction arrangement to ensure equal draw-off, correcting...
Mikrofill Maxi Pressure Unit Upgrade – Manchester
We recently completed a project at an airline office building near Manchester Airport, where the existing dual system pressure unit had become problematic and unreliable. To resolve this, our team removed the outdated setup and installed two individual Mikrofill Maxi...
Harrogate Grundfos Installation
At a site in Harrogate, the existing booster set was significantly undersized and unable to meet the building’s water demand - especially during peak usage. This led to poor performance across the system and persistent pressure issues, particularly on the upper...
Xylem Hydrovar X 4-Pump Booster Set Installation
This was a brilliant project to finally get over the line. This replaced an ageing 5-pump set feeding an apartment block in Salford Quays. The existing set was hanging on by a thread and had caused multiple water outages in the last 12 months. It was end of life and...
Stockport Hotel – Dynamic H-Line Pressurisation Unit
We work closely with a large hotel chain to manage their assets on a lifecycle basis but also remove large expansion vessels where possible to reduce the number of assets they have to have Written Schemes of Examinations for and costly insurance inspections! The...
South Wales – Xylem Lowara SMB Booster Set Install
We were asked by a South Wales local authority to replace an obsolete booster set which had been bypassed for some time with a modern equivelant booster set. The difficulties:Space! This plantroom was very tight, as a result we either needed a bespoke booster set or a...
Rail Depot Bespoke Booster Set Install
We recently completed this bespoke booster set install at a large rail depot for Hydraclean. Hydraclean complete a lot of large turnkey projects for an array of clients and asked us to assist on this installation. We supplied and install an 11kW Aquaboost MARB panel...
South Wales University – New H Line Installation
PressBoost recently carried out a system upgrade at a university in South Wales. The existing pressurisation unit had a failed pump, meaning the system could no longer refill. Blocked pipework and failed diaphragms in the vessels added to the issue. We removed two...
H-Line High Flow Dynamic Pressurisation Unit Install
This H-Line installation took place in a very large residential building in Liverpool. The existing unit had a failed diaphragm, failed spill valves and down to one pump. It had been the standby unit for sometime and only used as the backup, however, when the primary...
Emergency 3-pump Booster Set Installation
We recently completed this installation at a multi purpose building in Manchester City Centre. The existing fixed speed set was ageing and had more than stood the test of time. However, now both pumps had completely failed and the building had no water. We managed to...
Twin-pump Booster Set Installation at St Helens Hospital
We recently installed this twin pump set at St Helens Hospital. We have just started working with Vinci for Liam Campbell and Vercity for this new site - our thanks to all for the support to help get this job completed on time and to plan. The existing set was...
Commercial Development – Leeds City Centre
CAT5 Booster Set Installation We recently completed this Stuart Turner iBoost installation at a large new development in Leeds. This is for a dedicated feed to 4no. pop ups in a square which provide temporary water for watering plants, cleaning paving etc. The...
Hale Apartment Block – Solution for Low Water Pressure
At an apartment block in Hale, a penthouse resident was experiencing ongoing water pressure issues, with their shower regularly losing pressure due to an unreliable mains supply. The old storage tank was no longer fit for purpose, frequently emptying and failing to...
HL Hydronics Unit Upgrade at North West Academy High School
PressBoost recently completed a major pressurisation upgrade at a large academy high school in the North West. The existing system had become increasingly unreliable, with multiple issues affecting performance—including a problematic pressure unit and four failed...
3 Pump Booster Installation – Liverpool Apartment Block
PressBoost recently completed the installation of a new 3-pump variable speed Stuart Turner booster unit at a residential apartment block in Liverpool. The project was carried out by our engineers, Carl Rogerson, Kieran Buckley Shields, Ben Brown and John Murphy. The...
North West Court Building – Booster Replacement
PressBoost recently completed a successful booster set replacement at a large court building in the North West. The original system, which featured outdated fixed-speed pumps and a failed pressure vessel, had been operating inefficiently for some time. By the time of...
Booster Set Replacement – Bradford Job Centre
After ongoing reliability issues caused by a failed pump, drive, and problematic panel, this Bradford client needed a dependable solution. PressBoost Engineers Carl Rogerson and Kieran Buckley-Shields installed a new two-pump variable speed booster set featuring the...
Booster Unit Replacement at Research Facility
A research and testing facility in York had a fixed-speed Booster Unit in poor condition, which was in need of replacement after a long 25+ years of service.A new Grundfos 2-pump variable speed unit was recommended and installed by PressBoost engineers Carl Rogerson...
Folkestone Hotel – Bespoke Unit Install
An existing Boosted Water Unit at a Folkestone hotel was found to have two failed inverters and a faulty pump. We replaced the system with a bespoke Stuart Turner three-pump variable speed unit, complete with high-performance Lowara pumps. Installation carried out by...
Twin Pump Stuart Turner VARiFLO Booster Set Installation – Altrincham
We recently carried out the installation of a Twin Pump Stuart Turner VARiFLO Booster Set at a site in Altrincham, replacing the existing obsolete Wilo system. This upgrade was completed out of hours on a Friday, while the office was closed, ensuring minimal...