Stockport Hotel – Ebara E-SPD+ Installation

Stockport Hotel – Ebara E-SPD+ Installation

A hotel in Stockport has recently completed a significant upgrade to its water supply infrastructure by replacing an outdated fixed-speed booster unit with a modern Ebara E-SPD+ three-pump variable speed system. The three-pump design provides enhanced reliability,...

Manchester Student Accommodation Building – Water Damage

Manchester Student Accommodation Building – Water Damage

We received a call from our friends at Pump Solutions at the end of March to a Booster Unit that had been water damaged. The outage was costing the building thousands of pounds a day as they had to move students out of the block. Water damaged was an under statement...

Chester Apartment Block – Booster Set Replacement

Chester Apartment Block – Booster Set Replacement

We attended an apartment block in Chester due to a total loss of water at the site. Upon inspection, all three pump drives were found to have failed. To restore water supply temporarily, the pumps were hard-wired. Further investigation revealed that one of the three...

H-Line Installation – Liverpool School

H-Line Installation – Liverpool School

A school in Liverpool has replaced its outdated pressure unit with a new H-Line spill and fill pressure unit.This modern system is 90% efficient in handling expansion, offering significant space savings. It also eliminates the need for written scheme insurance...

Blackpool Hotel – Bespoke Booster Set Installation

Blackpool Hotel – Bespoke Booster Set Installation

A hotel in Blackpool required a new booster set after the existing system suffered from three failed pumps. The previous setup was oversized for the hotel’s actual water demand, leading to inefficiencies. Our team—Antony Chesters, John Murphy, and Adam Brown—installed...

Lowara Hydrovar X installation – Student Accommodation Liverpool

Lowara Hydrovar X installation – Student Accommodation Liverpool

We were recently asked to provide a quotation for a replacement booster set at this apartment block in Liverpool following a series of water outages they had experienced, leaving the building teetering on one remaining pump. We quoted for multiple options with the...

Liverpool Office Block – Boosted Water Conversion

Liverpool Office Block – Boosted Water Conversion

A large office block in Liverpool was experiencing low mains water pressure, which resulted in no pressure at all on the top floor. Despite the site receiving more than the minimum required by the water board, boosting was the only solution. Due to space limitations,...

Bolton Wanderers Stadium – Cold Water Booster Set Replacement

Bolton Wanderers Stadium – Cold Water Booster Set Replacement

In February 2025 we completed the replacement of a 4-pump fixed speed booster set at BWFC, to convert them to variable speed and provide huge energy savings for the stadium long term. The existing Holden and Brooke set was long obsolete and is original to the build of...

Stoke-On-Trent Aquaboost Installation

Stoke-On-Trent Aquaboost Installation

This apartment block in Stoke-on-Trent had an outdated and faulty booster pump set that had completely failed. As a temporary solution, the building was relying on a bypass from another Booster Set, which caused flow issues during peak demand. The old pump had a power...

Pressurisation Unit Replacement – Stratford Hotel

Pressurisation Unit Replacement – Stratford Hotel

We recently replaced a failed Mikrofill Pressurisation Unit with a new Flamco single-pump system at a hotel in Stratford.The existing unit had suffered failed internals and persistent leaks, affecting the system's efficiency. Engineer Andrew Shelley completed the...

3-pump Stuart Turner MAB Bespoke Booster Set Installation

3-pump Stuart Turner MAB Bespoke Booster Set Installation

This is a job we really want to shout about as it represents everything PressBoost is about. We recently got called to this large hotel as the existing 4-pump set had been water damaged in the recent flooding in the North West. When we attended site, we found all 4no....

Mikrofill Maxi Installation at Welsh University

Mikrofill Maxi Installation at Welsh University

We recently installed this twin pump Mikrofill Maxi Plus Pressurisation Unit at a large University in Wales. The existing unit had a burnt out pump and caused and outage due to single point of failure. Therefore, we installed this tidy twin pump unit to provide...

Flamco 125 Installation at North West Hospital

Flamco 125 Installation at North West Hospital

We recently installed this Flamco 125 unit to replace a failed and obsolete Mikrofill unit at a local hospital.We opted for the Flamco unit to provide a pumped unit, as we highly recommend this against EFD’s. The Flamco utilises the small space really well and will...

Oldham Hotel – Booster Set Replacement

Oldham Hotel – Booster Set Replacement

We recently visited a hotel / pub from a major chain with a 20+ yr old fixed speed set and vessel which required a written scheme of examination. We replaced this with a new Stuart Turner Aquaboost VARiFLO twin pump variable speed set, and small GWS pump accumulator...

Sheffield Shopping Centre Booster Set Replacement

Sheffield Shopping Centre Booster Set Replacement

We recently attended this shopping centre in Sheffield where the existing Grundfos home Booster Set had failed.PressBoost Senior Engineer Andrew Shelley replaced the unit with an equivalent unit from Lowara, the Resvari Plus 250 3-4.5 Cat 5 Booster Set.A tidy,...

North West College – Booster Set Replacements

North West College – Booster Set Replacements

This college in the North West was new site for us, and we had to replace two old fixed speed units. One of the units had a failed pump and non-return valves causing the remaining working pump to run constantly even when no demand was present. PressBoost engineers Ben...

Birmingham Hotel – Booster Unit Replacement

Birmingham Hotel – Booster Unit Replacement

We recently attended this hotel in Birmingham, where the existing fixed speed Booster Unit had failed and had stopped delivering pressurePressBoost engineer Carl Rogerson installed a new Ebara E-SPD Twin Pump Variable Speed Booster and GWS Pressure Vessels.All...

North West Hospital Grundfos PHT Installation

North West Hospital Grundfos PHT Installation

We recently worked at this hospital in the North West who had a failing, obsolete unit with failed pumps.The unit was replaced with a new Grundfos PHT Pressure Unit giving the site a reliable solution for years to come.Full installation completed to a high standard by...

H-Line Installation – Nuneaton Leisure Centre

H-Line Installation – Nuneaton Leisure Centre

This is a recent Dynamic H-Line Pressurisation Unit installation at a leisure centre in Nuneaton. The existing Warmac spill and fill was from the early 1980s and had provided amazing longevity. However, the system dynamics had changed, and the existing unit was...

Xylem Booster Set and PureWater GRP Tank Installation

Xylem Booster Set and PureWater GRP Tank Installation

The old fixed speed booster set was down to one pump that was noisy.This was replaced by a Xylem SMB variable-speed Booster Set set which will provide significant energy savings, being more efficient and a much lower kw motor rating. We also replaced the tanks with 2...

RPZ Valve Replacements – Welsh University

RPZ Valve Replacements – Welsh University

Along with our core offering of pressure and booster maintenance, we also specialise in the test, commissioning and installation of RPZ Valves [BA devices]. Following annual testing of the valves pictured these 2x valves failed at this major Welsh university. Given...

North-West University PD-X Installation

North-West University PD-X Installation

PressBoost recently completed this installation at a large North-West university where an existing combined Pressurisation Unit was in need of replacing - the recently launched HL Hydronics PD-X combined Pressurisation Unit and Degasser proving the perfect upgrade as...

Salford Hydrovar X Install

Salford Hydrovar X Install

We recently attended a site in Salford where the existing 3-pump booster set was being maintained by another company and had failed completely. Time was of the essence as this meant the building was temporarily fed by another booster set. Fortunately, we were asked to...

Stuart Turner VARiFLO Install – Prestwich

Stuart Turner VARiFLO Install – Prestwich

Location: PrestwichProperty Type: Apartment BlockINSTALLED: STUART TURNER VARiFLOWe were recently called in to provide an alternative quote at this site close to home in Prestwich, Manchester. The existing unit had been condemned by others and was down to a single...

Xylem Hydrovar X Installation – Gloucester

Xylem Hydrovar X Installation – Gloucester

Here we have a nice 3-pump Xylem Hydrovar X CWB Set installation in Gloucester.Whilst carrying out a PPM visit at this large site in May we found No.1 pump off and U/S, No.3 pump extremely noisy and not delivering, with only No.2 pump fully operational. This coupled...

New HL Hydronics Product Installed at North-West University

New HL Hydronics Product Installed at North-West University

We recently installed this new product from HL Hydronics at a major North-West university. HL Hyrdonics recently launched the PD-X combined Pressurisation Unit and Degasser which we recently tested on a visit to Sweden.Whilst completing a PPM visit at this university...

Stuart Turner MAB North West Library Upgrade

Stuart Turner MAB North West Library Upgrade

Location: North WestProperty Type: LibraryInstalled: Stuart Turner MAB CWBWe recently installed this Stuart Turner MAB CWB Set at a large library in the North West as planned lifecycle upgrade works. The existing unit had come to end of life and this new unit will...

Leisure Centre Booster Set Replacement

Leisure Centre Booster Set Replacement

Location: ManchesterProperty Type: Leisure CentreInstalled: Ebara ESPD Twin PumpWe recently completed this CWB Set upgrade for a local City Council following the failure of the ageing fixed speed booster set on site. This was completed in one working day with minimal...

Expansion Vessel Servicing & Maintenance

Expansion Vessel Servicing & Maintenance

Our engineer Ben Brown recently discovered this vessel had failed and posed a significant risk to the DHW System. As you can see, water is clearly the wrong side of the diaphragm coming out of the Schrader valve. Expansion Vessel servicing and maintenance is critical...

Uncategorized