Grundfos MPC-E Installation – Sheffield Office Block
Location: Sheffield
Property Type: Office Block
Installed: Grundfos HPC-E
This was a recent lifecycle replacement job at an office block in Sheffield. The old unit had an obsolete panel and inverters and also had leaking rubber bellows on suction and delivery.
Our engineers installed a new, efficient Grundfos MPC-E CU352 Booster with Dn80 rubber bellows. This replacement was performed out of hours on a Saturday to minimise disruption to the site.
Before
After
After