Half Term Installation at North West School
Here at PressBoost we are often asked to complete works ‘Out of Hours’ or on specified dates. We are always happy to accommodate and work with the client towards a future deadline. A common preference for schools is that works are completed during Half Term. This half term we have installed this 3-pump Stuart Turner MAB cold water booster set at a high school in the North West.
The existing set was down to 2-pumps and had a failed master drive. We supplied and installed the MAB set to provide greater reliability going forward. Completed in time for the start of the new term the following week!