Stuart Turner Booster Unit Installation – Manchester

We recently completed the installation of this @StuartTurner Cold Water Booster Unit at a Tower Block in Manchester.

The existing unit was obsolete, down to 2-pumps, accumulator vessel U/S and had controls issues. Working with the site contractor we were asked to quote for a replacement unit as part of a tender process.

We were successful and completed all works during working hours with a planned interruption to water. We modified the suction pipework right back to the tanks in copper, and modified the discharge pipework right back to the copper rising main, removing all ABS pipework.

The StuartTurner MAB cold water booster unit was selected in this instance and provides a smart, modern upgrade for this site.