Booster Unit Installation

Xylem SMB Booster Set Installation – Liverpool

Xylem SMB Booster Set Installation – Liverpool

This leisure centre in Liverpool had a Booster Unit with an obsolete panel and pumps. A panel fault was causing the pumps to constantly run which was heavily cavitating them.We replaced the existing unit with a new variable speed Xylem SMB Booster Unit, which will...

Lowara SMB30 Installation – Manchester

Lowara SMB30 Installation – Manchester

We recently installed this Lowara SMB30 set at a site in Manchester. The existing set had obsolete controls and was intermittently faulting causing water outages. Due to age and condition of that unit we decided replacement set was the best course of action. The SMB...

Six Cold Water Booster Set Installs

Six Cold Water Booster Set Installs

North West Housing Association We recently completed upgrade works to six Tower Blocks in the North West for a Housing Association that we have worked with for over 10-years. They came to us earlier this year to discuss upgrading the pump sets on six of their blocks...

PressBoost in January

PressBoost in January

January was another busy month here at PressBoost. Throughout the month we carried out a large amount of service work across the country, into Scotland and onto the Isle of Man. This represents the core of our business and something we pride ourselves on. Service and...

Express Gifts

Express Gifts

The Project: We were recently contacted by Express Gifts to help deal with a long standing problem of pressure issues at one of their sites. We attended site to find that their current method of supplying water around the building was via storage tanks in the roof;...

Twin Pump Horizontal Booster Set Replacement

Twin Pump Horizontal Booster Set Replacement

The Background: This booster set replacement was carried out in the centre of Manchester in November 2017. The existing booster set was down to a single pump, running constantly and barely delivering pressure. This was largely due to the dilapidated state of the set...

Fixed to Variable Speed Booster Unit Conversion

Fixed to Variable Speed Booster Unit Conversion

This installation was carried out at a site in Manchester City Centre. The existing unit was fixed speed and obsolete, furthermore, one of the two pumps had failed and as such the building was running on only one pump. This building has recently been renovated and is...

Booster Unit Installation