3-pump Stuart Turner MAB Bespoke Booster Set Installation
This is a job we really want to shout about as it represents everything PressBoost is about. We recently got called to this large hotel as the existing 4-pump set had been water damaged in the recent flooding in the North West. When we attended site, we found all 4no. Pumps had been submerged and were beyond repair.
We quickly attended to complete a temporary repair and restore water to the hotel on 1no. temporary pump, whilst sourcing a permanent solution.
We set about finding the quickest, most suitable solution for the site. This involved speaking with multiple supplier partners but also re-sizing the duty for the hotel, as the existing set was actually over sized.
The new set is sized Duty/Assist/Standby on a 3-pump set rather than a 4-pump. It also drops from 11kW pumps previously to 5.5kW once correctly sized. This will provide huge energy savings for the site going forward.
A fantastic installation from our dedicated team of engineers: Antony Chesters, Ben Brown, Kieran Shields & John Murphy.

Before

After

After