We recently completed this 3-pump variable speed booster set installation in Birmingham as part of some project upgrade works for a new customer. The existing 4-pump set had stood the test of time and served its purpose. Also, the jockey and one of the main pumps had been removed some time ago and site found themselves down to 2-pumps. Looking at the age of the unit and the size of the building it became apparent the existing unit was dramatically oversized. As a result, we resized the unit to suit the demand of the building and installed a 3-pump Lowara SMB unit.
The energy savings will be dramatic for this site, with much smaller and much more efficient pumps! If you are interested in possible energy savings that could be applicable to your site, please visit https://www.pressboost.co.uk/energy-saving/ and complete the form. We will get back to you asap with potential savings.