Commercial Development – Leeds City Centre

CAT5 Booster Set Installation

We recently completed this Stuart Turner iBoost installation at a large new development in Leeds. This is for a dedicated feed to 4no. pop ups in a square which provide temporary water for watering plants, cleaning paving etc.

The existing setup didn’t allow for any flushing and was vastly oversized and took up the majority of the security office. This new setup takes up far less space and is now correctly sized. Furthermore, the client now plans to put a small kitchenette in the room thanks to the space gained, so the iBoost complements this perfectly and will fit in with the kitchen nicely. Whilst also being a really quiet unit, more conducive to a work environment for the operatives working in the room.

Completed over the course of 2-days we dismantled the existing equipment which had never actually been commissioned and put in use.

A smart installation completed by Carl Rogerson, Kieran Shields and Antony Chesters.

    Before
    After
    After