Emergency 3-pump Booster Set Installation

We recently completed this installation at a multi purpose building in Manchester City Centre. The existing fixed speed set was ageing and had more than stood the test of time. However, now both pumps had completely failed and the building had no water. We managed to quickly source a Lowara SMB set (switching to Duty/Assist/Standby) and attend quickly to carry out the replacement booster set.

The new set will provide significant energy savings with the switch to variable speed and dropping a couple of kW sizes with the pumps. Our engineers had this swapped out in a matter of hours and back online feeding the building.

Fantastic turnaround for a great long term customer of ours.

All works completed over two days, this was a seamless installation. All works planned in to suit site requirements and in conjunction with the site team.