F&E Conversion to Pressurised System – Warrington
PressBoost were recently contacted by this site in Warrington to pressurise their heating system which was previously F&E.
We selected the HL Hydronics H-Line for this application which is one of the ideal install locations for this dynamic spill & fill unit.
Our engineers then drained down and linked out the feed tank in the roof, removed the vent pipe and installed the new pressurisation unit in the Boileroom on the ground floor.
This was planned during the summer when the heating was off to ensure no disruption to the client.
The client had already completed some prep work for this install, there was a plinth we could utilise within the Boileroom and they had installed a new electrical circuit in the control panel ready for the pressure unit install. We then ran the new electrical feed and interlock circuit and integrated with the existing controls.