Folkestone Hotel – Bespoke Unit Install
An existing Boosted Water Unit at a Folkestone hotel was found to have two failed inverters and a faulty pump.
We replaced the system with a bespoke Stuart Turner three-pump variable speed unit, complete with high-performance Lowara pumps.
Installation carried out by efficiently PressBoost Engineers Ben Brown and Andrew Shelley.
We replaced the system with a bespoke Stuart Turner three-pump variable speed unit, complete with high-performance Lowara pumps.
Installation carried out by efficiently PressBoost Engineers Ben Brown and Andrew Shelley.