At a site in Harrogate, the existing booster set was significantly undersized and unable to meet the building’s water demand – especially during peak usage. This led to poor performance across the system and persistent pressure issues, particularly on the upper floors.

To resolve the issue, we replaced the unit with a correctly specified Grundfos booster set, capable of delivering consistent pressure throughout the building. As part of the upgrade, we also linked out the existing roof tanks to transition the system from atmospheric feed to a fully pressurised solution – ensuring reliable supply even to the highest levels of the property.

This project was carried out by Antony Chesters, Andrew Shelley, and Adam Brown, delivering a future-proofed setup tailored to the building’s needs.