HL Hydronics Installation – Buxton Hotel
This H-Line and 190 litre spill tank installation was completed at a hotel in Buxton. The site didn’t previously have a pressurisation unit, and reported that they had multiple issues for years with pressure.
We attended and found an expansion vessel failed and a manual fill system in place. We recommended a H-Line due to its versatility and ability to cope with demanding systems. The system was relatively small so only a small spill tank needed on this occasion. All pipework and electrics modified and new electrical feed and interlock circuit for the new unit. All in a days work for our engineers!

Before

After