Three Pump variable speed Booster Unit and Sectional Tank Install

This ageing and obsolete transfer set at a site in Salford was in need of updating and the site were keen to change the unit to variable speed,  due to the significant energy savings this option provides. PressBoost cut and capped the pipework feeding the roof tanks which were then drained and decommissioned and converted the building […]

Teknospeed Booster Unit Install

This install was carried out at a hotel in Bournemouth. This site had a Grundfos pump feeding several areas of the hotel but the actual application of the pump was somewhat of an unknown quantity. However, given the size of the building and the static head of the system, the pump was not fit for purpose. The […]