Variable Speed Conversion – Nottingham Hotel
This twin-pump Lowara SMB install was carried out at a hotel in Nottingham. The existing set was oversized and fixed speed. Therefore, by resizing it appropriately and converting to variable speed this hotel will recover significant energy savings.
A smart installation from our engineers, and the sheer size difference acts as a good demonstration of how much technology has moved on. The SMB is highly efficient and IE5 rated – whilst benefiting from a 2-year manufacturer’s warranty.
Before
Before
After
After