3 Pump Lowara SMB Variable Speed Booster Installation – Manchester
This 3 pump Lowara SMB Variable Speed Booster Set installation was recently completed in Manchester city centre. The existing unit had problematic controls and a repair would have been costly. After considering both options, the site opted forĀ replacement unit and the IE5 rated SMB set will provide useful energy savings for the site in the years to come. Installation completed by PressBoost engineers – Andy Shelley, Ben Brown and Adam Brown.