Ebara EVMS Installation – North West Hospital
This twin pump Ebara EVMS Boosted Set installation was carried out late last year following the total failure of the existing TKS set.
We had been advising that the existing set was obsolete for some time, however, eventually the existing set failed completely causing a water outage on site.
Our engineers turned to and installed this set as emergency works, the same day! To restore water to this hospital.
The Ebara EVMS range is a smart and budget friendly solution, which has become a useful alternative in our offering.

Before

Before

After

After
