This twin pump Ebara EVMS Boosted Set installation was carried out late last year following the total failure of the existing TKS set. We had been advising that the existing set was obsolete for some time, however, eventually the existing set failed completely causing...
Ebara EPSD
Manchester Apartments – Ebara ESPD Booster Installation
At a residential apartment block in Manchester, we recently upgraded an old, obsolete booster set with a new three-pump Ebara ESPD variable speed booster set. As part of the installation, we also modified the suction arrangement to ensure equal draw-off, correcting...


