Booster Set Replacement – Bradford Job Centre

After ongoing reliability issues caused by a failed pump, drive, and problematic panel, this Bradford client needed a dependable solution.

PressBoost Engineers Carl Rogerson and Kieran Buckley-Shields installed a new two-pump variable speed booster set featuring the highly reliable Xylem SMB. The client was given the choice to replace the faulty pump or opt for a complete new unit — they chose the latter, recognising the long-term cost benefits and peace of mind it brings.

Another solid upgrade delivered by the PressBoost team.

    Before

    After

    After