A recent project at a school in the Greater Manchester area involved the replacement of a failing three-pump fixed-speed booster set. With the existing unit close to complete failure, the site required a rapid turnaround to restore consistent water supply. Our team...
Lowara Booster Set
Xylem Hydrovar X 4-Pump Booster Set Installation
This was a brilliant project to finally get over the line. This replaced an ageing 5-pump set feeding an apartment block in Salford Quays. The existing set was hanging on by a thread and had caused multiple water outages in the last 12 months. It was end of life and...
South Wales – Xylem Lowara SMB Booster Set Install
We were asked by a South Wales local authority to replace an obsolete booster set which had been bypassed for some time with a modern equivelant booster set. The difficulties:Space! This plantroom was very tight, as a result we either needed a bespoke booster set or a...
Twin-pump Booster Set Installation at St Helens Hospital
We recently installed this twin pump set at St Helens Hospital. We have just started working with Vinci for Liam Campbell and Vercity for this new site - our thanks to all for the support to help get this job completed on time and to plan. The existing set was...
Booster Set Replacement – Bradford Job Centre
After ongoing reliability issues caused by a failed pump, drive, and problematic panel, this Bradford client needed a dependable solution. PressBoost Engineers Carl Rogerson and Kieran Buckley-Shields installed a new two-pump variable speed booster set featuring the...
Chester Apartment Block – Booster Set Replacement
We attended an apartment block in Chester due to a total loss of water at the site. Upon inspection, all three pump drives were found to have failed. To restore water supply temporarily, the pumps were hard-wired. Further investigation revealed that one of the three...
Lowara Hydrovar X installation – Student Accommodation Liverpool
We were recently asked to provide a quotation for a replacement booster set at this apartment block in Liverpool following a series of water outages they had experienced, leaving the building teetering on one remaining pump. We quoted for multiple options with the...
North West College – Booster Set Replacements
This college in the North West was new site for us, and we had to replace two old fixed speed units. One of the units had a failed pump and non-return valves causing the remaining working pump to run constantly even when no demand was present. PressBoost engineers Ben...
Salford Hydrovar X Install
We recently attended a site in Salford where the existing 3-pump booster set was being maintained by another company and had failed completely. Time was of the essence as this meant the building was temporarily fed by another booster set. Fortunately, we were asked to...
Mains Water Conversion to Boosted Supply
Location: ManchesterProperty Type: 8 Storey BuildingInstalled: Hydrovar X This 8-storey building in Trafford Park recently ran out of water to the top two floors due to ever decreasing mains pressure. This caused large scale operational issues on site and as such they...
Lowara SMB30 Installation – Manchester
We recently installed this Lowara SMB30 set at a site in Manchester. The existing set had obsolete controls and was intermittently faulting causing water outages. Due to age and condition of that unit we decided replacement set was the best course of action. The SMB...
Lowara Booster Set Install – Cumbria
PressBoost recently attended and installed a new twin-pump Lowara SMB Booster Set at a Pub in Cumbria. This set replaced an existing obsolete Teknospeed unit. The vessels on the previous Teknospeed set were only 12 months old so were retained for the new unit. All...












