We attended an apartment block in Chester due to a total loss of water at the site. Upon inspection, all three pump drives were found to have failed. To restore water supply temporarily, the pumps were hard-wired. Further investigation revealed that one of the three...
Lowara Booster Set
Lowara Hydrovar X installation – Student Accommodation Liverpool
We were recently asked to provide a quotation for a replacement booster set at this apartment block in Liverpool following a series of water outages they had experienced, leaving the building teetering on one remaining pump. We quoted for multiple options with the...
North West College – Booster Set Replacements
This college in the North West was new site for us, and we had to replace two old fixed speed units. One of the units had a failed pump and non-return valves causing the remaining working pump to run constantly even when no demand was present. PressBoost engineers Ben...
Salford Hydrovar X Install
We recently attended a site in Salford where the existing 3-pump booster set was being maintained by another company and had failed completely. Time was of the essence as this meant the building was temporarily fed by another booster set. Fortunately, we were asked to...
Mains Water Conversion to Boosted Supply
Location: ManchesterProperty Type: 8 Storey BuildingInstalled: Hydrovar X This 8-storey building in Trafford Park recently ran out of water to the top two floors due to ever decreasing mains pressure. This caused large scale operational issues on site and as such they...
Lowara SMB30 Installation – Manchester
We recently installed this Lowara SMB30 set at a site in Manchester. The existing set had obsolete controls and was intermittently faulting causing water outages. Due to age and condition of that unit we decided replacement set was the best course of action. The SMB...
Lowara Booster Set Install – Cumbria
PressBoost recently attended and installed a new twin-pump Lowara SMB Booster Set at a Pub in Cumbria. This set replaced an existing obsolete Teknospeed unit. The vessels on the previous Teknospeed set were only 12 months old so were retained for the new unit. All...