We attended an apartment block in Chester due to a total loss of water at the site. Upon inspection, all three pump drives were found to have failed. To restore water supply temporarily, the pumps were hard-wired. Further investigation revealed that one of the three pumps, as well as a non-return valve, had also failed.

To provide a long-term and efficient solution, we supplied and installed a new, high-efficiency Hydrovar X Booster Set, ensuring improved reliability and longevity for the building’s water supply.

Installation carried out by Carl Rogerson, Antony Chesters, and Andrew Shelley.