Flamco 125 Installation at North West Hospital

We recently installed this Flamco 125 unit to replace a failed and obsolete Mikrofill unit at a local hospital.
We opted for the Flamco unit to provide a pumped unit, as we highly recommend this against EFD’s. The Flamco utilises the small space really well and will provide a much more suitable filling setup for this system going forward.
Installed by our engineers Ben Brown and John Murphy, completed with minimal disruption to site given the criticality of the building.

    North West Hospital Installation

    Before

    HL Hydronics PD-X Installation - North West University (after)

    After