Location: North WestProperty Type: HospitalInstalled: Grundfos & FlamcoPictured here are two Pressurisation Unit replacements recently completed for a major North West Hospital. The first is a standard Pressure Unit replacement after pump failure, followed by a...
Hospital
Fixed Speed to Variable Speed Booster Set Replacement
This is a job we have been quoting for a long, long time! The existing fixed speed booster set in this North West Hospital had been down to a single pump and constantly running for the past 6 service visits! Budget constraints had meant site held on for as long as...
HL Hydronics H-Line Installation
More installations at local hospitals - This time , a HL Hydronics H-Line unit was installed by engineers Carl and Andy.[dsm_perspective_image src="https://www.pressboost.co.uk/pbWP/wp-content/uploads/2022/06/hline-4.webp" alt="PressBoost Booster Set Installation"...
Twin Pump Lowara SMB Install at North West Hospital
The existing Teknospeed unit had been failing for some time and due to its obsolescence, replacement was the only suitable option.Another tidy installation from our engineers Ben Brown, Antony Chesters and Andy Shelley; and a happy client to...
Two Lowara Presfix Beta Installations at Local Hospital
These two Lowara Presfix Beta installations at a local hospital were recently completed in one day by PressBoost engineer Andy Shelley. [dsm_perspective_image src="https://www.pressboost.co.uk/pbWP/wp-content/uploads/2022/05/lowara-presfix-install-1.webp"...