SPEAK TO US TODAY

0161 798 5872

SPEAK TO US TODAY

0161 798 5872

H-Line Installation – Nuneaton Leisure Centre

This is a recent Dynamic H-Line Pressurisation Unit installation at a leisure centre in Nuneaton.

The existing Warmac spill and fill was from the early 1980s and had provided amazing longevity.

However, the system dynamics had changed, and the existing unit was constantly spilling and filling and site wanted a modern alternative.

Step forward the H-Line – a sleek, modern alternative with touch screen display, Grundfos pump, Danfoss motorised valve and Schneider controls, it provides a truly modern digital solution. We also installed a new 650-litre Polyethylene expansion tank in place of the corroding mild-steel expansion tank.

A fantastic install from our engineers and hopefully the first job of many, for this new client.

    HL Hydronics PD-X Installation - North West University (before)

    Before

    HL Hydronics PD-X Installation - North West University (after)

    Before

    HL Hydronics PD-X Installation - North West University (after)

    After

    HL Hydronics PD-X Installation - North West University (after)

    After