We recently completed the replacement of an outdated analogue pressurisation unit at a leisure centre in Wakefield, upgrading the system to a modern Grundfos PHT digital pressurisation unit. The new installation provides several key improvements over the previous...
Leisure Centre
H-Line Installation – Nuneaton Leisure Centre
This is a recent Dynamic H-Line Pressurisation Unit installation at a leisure centre in Nuneaton. The existing Warmac spill and fill was from the early 1980s and had provided amazing longevity. However, the system dynamics had changed, and the existing unit was...
Xylem SMB Booster Set Installation – Liverpool
This leisure centre in Liverpool had a Booster Unit with an obsolete panel and pumps. A panel fault was causing the pumps to constantly run which was heavily cavitating them.We replaced the existing unit with a new variable speed Xylem SMB Booster Unit, which will...
Leisure Centre Booster Set Replacement
Location: ManchesterProperty Type: Leisure CentreInstalled: Ebara ESPD Twin PumpWe recently completed this CWB Set upgrade for a local City Council following the failure of the ageing fixed speed booster set on site. This was completed in one working day with minimal...




