Manchester School – 3-Pump Variable Speed Booster Replacement

A recent project at a school in the Greater Manchester area involved the replacement of a failing three-pump fixed-speed booster set. With the existing unit close to complete failure, the site required a rapid turnaround to restore consistent water supply.

Our team supplied and installed a new Lowara three-pump variable speed booster set, converting the system from the previous three-phase setup to a single-phase alternative. This approach allowed us to deliver a faster solution without compromising performance, thanks to the quick availability from our manufacturer.

The school is delighted with the result and now has the reassurance of a reliable, efficient booster system that ensures consistent water pressure throughout the building.

Installation carried out by Carl Rogerson and Anthony Chesters.

    Before

    After

    After

    Project Engineers

    Antony Chesters

    Carl Rogerson