Stockport Hotel – Ebara E-SPD+ Installation
A hotel in Stockport has recently completed a significant upgrade to its water supply infrastructure by replacing an outdated fixed-speed booster unit with a modern Ebara E-SPD+ three-pump variable speed system.
The three-pump design provides enhanced reliability, helping to reduce maintenance downtime and extend the lifespan of the equipment.
With the Ebara E-SPD+ in place, the hotel is now better positioned to deliver a better guest experience, with improved water pressure for showers, taps, and general operations.
An efficient installation by PressBoost Engineers Carl Rogerson and Andrew Shelley.


