At a residential apartment block in Manchester, we recently upgraded an old, obsolete booster set with a new three-pump Ebara ESPD variable speed booster set. As part of the installation, we also modified the suction arrangement to ensure equal draw-off, correcting...
Ebara Booster set
Stockport Hotel – Ebara E-SPD+ Installation
A hotel in Stockport has recently completed a significant upgrade to its water supply infrastructure by replacing an outdated fixed-speed booster unit with a modern Ebara E-SPD+ three-pump variable speed system. The three-pump design provides enhanced reliability,...
Birmingham Hotel – Booster Unit Replacement
We recently attended this hotel in Birmingham, where the existing fixed speed Booster Unit had failed and had stopped delivering pressurePressBoost engineer Carl Rogerson installed a new Ebara E-SPD Twin Pump Variable Speed Booster and GWS Pressure Vessels.All...
Leisure Centre Booster Set Replacement
Location: ManchesterProperty Type: Leisure CentreInstalled: Ebara ESPD Twin PumpWe recently completed this CWB Set upgrade for a local City Council following the failure of the ageing fixed speed booster set on site. This was completed in one working day with minimal...
Conversion from Atmospheric to Boosted Supply
Shortly before Christmas we were called to a large indoor arena in the Northwest to look at poor water pressure in their offices. We found the existing setup was a large storage tank in the roof providing atmospheric supply to the floors below. Whilst a common setup,...





