Stoke-On-Trent Aquaboost Installation
This apartment block in Stoke-on-Trent had an outdated and faulty booster pump set that had completely failed.
As a temporary solution, the building was relying on a bypass from another Booster Set, which caused flow issues during peak demand. The old pump had a power rating of 5.5kW, while the newly installed Stuart Turner Aquaboost MAB Booster Set operates at 4kW, ensuring improved efficiency and significant energy savings on electricity.
This install was carried out by PressBoost Engineers Antony Chesters, Andrew Shelley and John Murphy.
As a temporary solution, the building was relying on a bypass from another Booster Set, which caused flow issues during peak demand. The old pump had a power rating of 5.5kW, while the newly installed Stuart Turner Aquaboost MAB Booster Set operates at 4kW, ensuring improved efficiency and significant energy savings on electricity.
This install was carried out by PressBoost Engineers Antony Chesters, Andrew Shelley and John Murphy.

Before

After

After