Aquaboost

Liverpool Office Block – Boosted Water Conversion

Liverpool Office Block – Boosted Water Conversion

A large office block in Liverpool was experiencing low mains water pressure, which resulted in no pressure at all on the top floor. Despite the site receiving more than the minimum required by the water board, boosting was the only solution. Due to space limitations,...

Stoke-On-Trent Aquaboost Installation

Stoke-On-Trent Aquaboost Installation

This apartment block in Stoke-on-Trent had an outdated and faulty booster pump set that had completely failed. As a temporary solution, the building was relying on a bypass from another Booster Set, which caused flow issues during peak demand. The old pump had a power...

Oldham Hotel – Booster Set Replacement

Oldham Hotel – Booster Set Replacement

We recently visited a hotel / pub from a major chain with a 20+ yr old fixed speed set and vessel which required a written scheme of examination. We replaced this with a new Stuart Turner Aquaboost VARiFLO twin pump variable speed set, and small GWS pump accumulator...

Stuart Turner Aquaboost Install

Stuart Turner Aquaboost Install

We recently installed this 3-pump Stuart Turner Aquaboost booster set in a prominent office building in Central Manchester. The existing unit had served it’s time and had failed drives and was down to 1no. pump. We provided the customer with a repair or replace option...

Aquaboost