Manchester Apartments – Ebara ESPD Booster Installation

At a residential apartment block in Manchester, we recently upgraded an old, obsolete booster set with a new three-pump Ebara ESPD variable speed booster set.

As part of the installation, we also modified the suction arrangement to ensure equal draw-off, correcting issues caused by the original setup. The result is a more reliable, efficient, and properly balanced system for the building’s water supply. 

Great work delivered by Antony Chesters and John Murphy.

    Before

    Before

    After

    Project Engineers

    Antony Chesters

    John Murphy