Manchester Apartments – Ebara ESPD Booster Installation
At a residential apartment block in Manchester, we recently upgraded an old, obsolete booster set with a new three-pump Ebara ESPD variable speed booster set.
As part of the installation, we also modified the suction arrangement to ensure equal draw-off, correcting issues caused by the original setup. The result is a more reliable, efficient, and properly balanced system for the building’s water supply.
Great work delivered by Antony Chesters and John Murphy.

Before

Before

After
Project Engineers

Antony Chesters

