Twin-pump Booster Set Installation at St Helens Hospital
The existing set was obsolete and due for replacement due to age/condition. We offered the Xylem Hydrovar X on this project as it allowed us to drop from 4.0kW to a 3.0kW pump whilst providing slightly more duty, so this will provide valuable long term energy savings for the site.
We also installed a temporary pump through the course of the works so as to ensure no interruption to water whilst we completed the install. This is due to the criticality of the ward / patients. We utilised the standby tank and connected into the spare 4” discharge connection pictured.
All works completed over two days, this was a seamless installation. All works planned in to suit site requirements and in conjunction with the site team. Our install team was Antony Chesters, Kieran Shields and Carl Rogerson.