Birmingham Hotel – Booster Unit Replacement
We recently attended this hotel in Birmingham, where the existing fixed speed Booster Unit had failed and had stopped delivering pressure
PressBoost engineer Carl Rogerson installed a new Ebara E-SPD Twin Pump Variable Speed Booster and GWS Pressure Vessels.
All installed with minimal distruption to site.
Before
Before
After
After