We recently visited a hotel / pub from a major chain with a 20+ yr old fixed speed set and vessel which required a written scheme of examination. We replaced this with a new Stuart Turner Aquaboost VARiFLO twin pump variable speed set, and small GWS pump accumulator...
Global Water Solutions
Birmingham Hotel – Booster Unit Replacement
We recently attended this hotel in Birmingham, where the existing fixed speed Booster Unit had failed and had stopped delivering pressurePressBoost engineer Carl Rogerson installed a new Ebara E-SPD Twin Pump Variable Speed Booster and GWS Pressure Vessels.All...
Lifecycle Pressurisation unit Upgrade – Oldham
Location: OldhamProperty Type: LibraryInstalled: Grundfos PHTWe were recently contacted by this Library in Oldham to complete a large amount of lifecycle works for them. First up, the upgrade of their Pressurisation Unit and Expansion Vessels. The existing Grundfos...
H-Line Installation Replacing Traditional Expansion Vessels
This University has been working with us for some time to manage its assets and strategically remove expansion vessels where possible when planned upgrade works are required. At this building, they had an old analogue Pressurisation Unit come up for replacement under...
Holiday Park Pump Unit and Vessel Replacement
This Holiday Park in Wales had a failed single pump unit and vessel.PressBoost engineer Antony Chesters installed a new Lowara twin pump unit and a Global Water Solutions Pressure Tank. BeforeAfterAfter