Leisure Centre Booster Set Replacement
Location: Manchester
Property Type: Leisure Centre
Installed: Ebara ESPD Twin Pump
We recently completed this CWB Set upgrade for a local City Council following the failure of the ageing fixed speed booster set on site.
This was completed in one working day with minimal disruption to site and the newly installed Ebara ESPD Twin Pump Booster Set is a smart, cost effective solution.
Great install from our engineer Carl Rogerson.
Before
After
After