Oldham Hotel – Booster Set Replacement

We recently visited a hotel / pub from a major chain with a 20+ yr old fixed speed set and vessel which required a written scheme of examination.
We replaced this with a new Stuart Turner Aquaboost VARiFLO twin pump variable speed set, and small GWS pump accumulator vessel taking away the need for written scheme.

A tidy, efficient install by PressBoost Engineering Manager Ben Brown, which will provide reliability and energy savingsĀ  for the site.

    HL Hydronics PD-X Installation - North West University (before)

    Before

    HL Hydronics PD-X Installation - North West University (after)

    After