Booster Set Replacement – Birmingham City Centre

Complete Failure of 4-Pump Booster Set We were recently contacted by a new customer in Birmingham, as they had no water as their booster set had failed . This is a prestige 39-storey building spanning over 7,000 square feet, interruption to water at a building of this size had massive repercussions for thousands of people. […]

Pressurisation Unit & 750 Litre vessel replacement

This installation was carried out at the RAC building, Birmingham. The existing Armstrong unit was completely u/s. The pumps needed replacing but were obsolete. The pipework within the unit was leaking and steadily corroding the unit. The non return valve and system gauge were also u/s. Therefore, PressBoost installed a twin pump, digitally controlled Lowara Presfix Beta. As […]