This installation was carried out at a site in Manchester City Centre. The existing unit was fixed speed and obsolete, furthermore, one of the two pumps had failed and as such the building was running on only one pump. This building has recently been renovated and is...
Booster Unit Servicing
Fixed speed Booster Unit replacement
This site in Wigan, pictured below, had been having a number of problems with their fixed speed Booster Unit. This Booster feeds a large residential building and as such it is critical that it is kept in optimum condition. The existing unit was ageing and had a...