3 x Pressurisation Unit Installations

3 x Pressurisation Unit Installations

The background: These jobs were carried out at 3 different hotels in Bournemouth. All 3 units were u/s and in need of replacement. As a result, PressBoost installed all 3 units in a 2 day trip, thus, by combining the 3 jobs into such a small time frame we managed to...

Teknospeed Booster Unit Install

Teknospeed Booster Unit Install

This install was carried out at a hotel in Bournemouth. This site had a Grundfos pump feeding several areas of the hotel but the actual application of the pump was somewhat of an unknown quantity. However, given the size of the building and the static head of the...