These two Lowara Presfix Beta installations at a local hospital were recently completed in one day by PressBoost engineer Andy Shelley. [dsm_perspective_image src="https://www.pressboost.co.uk/pbWP/wp-content/uploads/2022/05/lowara-presfix-install-1.webp"...
Presfix Beta
Lowara Presfix Beta Pressurisation Unit Installation
The Existing Spill & Fill Pressurisation Unit This Pressurisation Unit was installed at a hotel in Buxton. We have maintained it for a number of years now and it was over 20 years old. This is a large system with relatively high operating pressures which is one of...
F&E conversion to pressurised system
This large hotel in Llandudno had an F&E tank in the roof feeding the heating system, however, they were having a number of issues with this method of operation, primarily they were struggling with poor flow which was causing severe disruption to the heating...
Pressurisation Unit Replacement December 2015
Here at PressBoost we pride ourselves on our ability to quickly respond to all enquiries and carry out the necessary work as soon as possible. This job in Folkestone is a site that we had not previously visited, they contacted us with a failing pressurisation unit...
Replacement Pressure Unit May 2015
PressBoost were called out to attend a fault on the pressure unit at a site in Tameside which was having problems with their heating. The existing Pressure unit had numerous U/S parts due to age and never having been on a service contract. The 500 Litre expansion...