Twin Pump Lowara SMB Install at North West Hospital
The existing Teknospeed unit had been failing for some time and due to its obsolescence, replacement was the only suitable option. Another tidy installation from our engineers Ben Brown, Antony Chesters and Andy Shelley; and a happy client to match!