Xylem SMB Booster Set Installation – Liverpool

This leisure centre in Liverpool had a Booster Unit with an obsolete panel and pumps. A panel fault was causing the pumps to constantly run which was heavily cavitating them.
We replaced the existing unit with a new variable speed Xylem SMB Booster Unit, which will provide significant ongoing energy savings to the site.
Installation completed with minimal disruption by Antony Chesters and Kieran Shields.