We recently visited a hotel / pub from a major chain with a 20+ yr old fixed speed set and vessel which required a written scheme of examination. We replaced this with a new Stuart Turner Aquaboost VARiFLO twin pump variable speed set, and small GWS pump accumulator...
Global Water Solutions
Birmingham Hotel – Booster Unit Replacement
We recently attended this hotel in Birmingham, where the existing fixed speed Booster Unit had failed and had stopped delivering pressurePressBoost engineer Carl Rogerson installed a new Ebara E-SPD Twin Pump Variable Speed Booster and GWS Pressure Vessels.All...
Lifecycle Pressurisation unit Upgrade – Oldham
Location: OldhamProperty Type: LibraryInstalled: Grundfos PHTWe were recently contacted by this Library in Oldham to complete a large amount of lifecycle works for them. First up, the upgrade of their Pressurisation Unit and Expansion Vessels. The existing Grundfos...
Grundfos PHT Pressure Unit Install South Wales
We recently installed this Grundfos PHT Pressurisation Unit and Global Water Solutions Expansion Vessel at a site in South Wales. The existing Pressurisation Unit was analogue controls with failed switches and down to 1-pump. Our engineers modified the pipework and...
University Pressure Unit For Chilled Water System
We recently attended a South Wales University to install a new Pressure Unit and Expansion Vessel on a chilled water system where the existing equipment had completely failed.The new Lowara Presfix Beta Pressurisation system and Global Water Solutions Expansion Vessel...
H-Line Installation Replacing Traditional Expansion Vessels
This University has been working with us for some time to manage its assets and strategically remove expansion vessels where possible when planned upgrade works are required. At this building, they had an old analogue Pressurisation Unit come up for replacement under...
Cheshire Gin Distillery Installation
A different install for the PressBoost engineers last week. Installing a Global Water Solutions G500 Reverse Osmosis unit and 2no. 325 litre acccumulator vessels. Thanks to GWS for the referral, we installed this for a Cheshire based Gin Distillery. All equipment...
Holiday Park Pump Unit and Vessel Replacement
This Holiday Park in Wales had a failed single pump unit and vessel.PressBoost engineer Antony Chesters installed a new Lowara twin pump unit and a Global Water Solutions Pressure Tank. BeforeAfterAfter
Lowara Presfix Beta Pressurisation Unit Installation
The Existing Spill & Fill Pressurisation Unit This Pressurisation Unit was installed at a hotel in Buxton. We have maintained it for a number of years now and it was over 20 years old. This is a large system with relatively high operating pressures which is one of...
Spill & Fill to Sealed System Conversion
Dilapidated Spill & Fill Setup This Spill & Fill unit had served the test of time as it was c.20 years old. It had only suffered failure due to age and obsolescence. This led to the pump vessel failing, which had a knock on effect and caused both pumps to...