Hospital

North West Hospital Grundfos PHT Installation

North West Hospital Grundfos PHT Installation

We recently worked at this hospital in the North West who had a failing, obsolete unit with failed pumps.The unit was replaced with a new Grundfos PHT Pressure Unit giving the site a reliable solution for years to come.Full installation completed to a high standard by...

North West Hospital Pressurisation Unit Replacements

North West Hospital Pressurisation Unit Replacements

Location: North WestProperty Type: HospitalInstalled: Grundfos & FlamcoPictured here are two Pressurisation Unit replacements recently completed for a major North West Hospital.  The first is a standard Pressure Unit replacement after pump failure, followed by a...

Fixed Speed to Variable Speed Booster Set Replacement

Fixed Speed to Variable Speed Booster Set Replacement

This is a job we have been quoting for a long, long time! The existing fixed speed booster set in this North West Hospital had been down to a single pump and constantly running for the past 6 service visits! Budget constraints had meant site held on for as long as...

Mikrofill Maxi Pressurisation Unit Installation

Mikrofill Maxi Pressurisation Unit Installation

PressBoost recently started distributing and installing the Mikrofill Maxi Pressurisation Unit. We have been very impressed with them so far and recently completed the installation of these 2no. High output units at a Hospital in the North West. The existing units...

Hospital – Variable Speed Pumpset Installation

Hospital – Variable Speed Pumpset Installation

PressBoost replaced a fixed speed pump feeding critical lab equipment in a local hospital which was tripping intermittently. We installed new single pump, digital variable speed pumpset which will keep the site operating effectively for the foreseeable...

West Yorkshire Hospital – Booster Set Installation

West Yorkshire Hospital – Booster Set Installation

PressBoost engineers Anthony, Ben and Adam recently installed this Booster Set in a West Yorkshire Hospital. The new set sized Duty Assist / Standby to suit the demands of the site, the installation took place over night on a Friday / Saturday morning as required by...

HL Hydronics H-Line Installation

HL Hydronics H-Line Installation

More installations at local hospitals - This time , a HL Hydronics H-Line unit was installed by engineers Carl and Andy.[dsm_perspective_image src="https://www.pressboost.co.uk/pbWP/wp-content/uploads/2022/06/hline-4.webp" alt="PressBoost Booster Set Installation"...

Twin Pump Lowara SMB Install at North West Hospital

Twin Pump Lowara SMB Install at North West Hospital

The existing Teknospeed unit had been failing for some time and due to its obsolescence, replacement was the only suitable option.Another tidy installation from our engineers Ben Brown, Antony Chesters and Andy Shelley; and a happy client to...

Two Lowara Presfix Beta Installations at Local Hospital

Two Lowara Presfix Beta Installations at Local Hospital

These two Lowara Presfix Beta installations at a local hospital were recently completed in one day by PressBoost engineer Andy Shelley. [dsm_perspective_image src="https://www.pressboost.co.uk/pbWP/wp-content/uploads/2022/05/lowara-presfix-install-1.webp"...

Twin Pump Booster set and Tank Installation – Hospital

Twin Pump Booster set and Tank Installation – Hospital

We recently installed a Twin-Pump Variable Speed Booster Set and a two-piece tank from Fluid Water Solutions at this North West hospital. Working for Pumpcare, we completed this installation through the night to minimise disruption to the hospital. A very well planned...

Hospital