This site in Liverpool had multiple problems with their heating system that were causing reliability issues. The control board on the existing LTHW pressure unit was faulty and obsolete while one of the pumps was U/S. Furthermore, both of the 500 litre vessels were U/S. PressBoost replaced both 500 Litre vessels and replaced the pressure unit with a Lowara Presfix beta MKII. As you can see from the pictures below the access for maintenance was not ideal, however, this is evidence of how we at PressBoost can modify units and utilise the existing space. If you have any queries about the plant at your site, please some more of our blogs in the latest news section and fill out a ‘quick enquiry’ form today!