Large Holiday Park in the South of England Upgrades Cold Water Booster Set

Water shortages on site: We were originally called in to investigate this booster set as site was experiencing pressure shortages and in some events, even lack of water across the site. When we attended we found the 4-pump set down to just 2 functioning pumps. The set had already lost a pump years earlier, which […]

Various Pressurisation Unit Installations

Lowara Presfix Beta Last week we attended a prestigious site in Manchester to replace a failed & obsolete Grundfos Impress. We recently picked up this site for a new managing agent, we found multiple issues with pressure units, booster units and vessels across the various plant rooms in the building. This pressure unit was the […]

Leisure Centre Cold Water Booster Pumps Replacement

Service and Maintenance History: This cold water booster set had been in operation since 2006 and served a large, busy leisure centre. Over the last 4 years, PressBoost have serviced and maintained the set on a bi-annual basis. For a set of its age, it was performing very well, however, the high demand of the […]

PressBoost 1st H-Line Installation

Pressurisation Unit Install – Sunderland As you may have seen from our recent posts, PressBoost have recently linked up with Bio-Nordic and HL Hydronics in Sweden, to bring the H-Line Pressurisation Unit to the UK. We recently installed the first of these units at a hotel in Sunderland. This site is a new site for […]

The HL Hydronics H-Line Pressurisation Unit

The Partnership: We were recently contacted by HL Hydronics as they wished to introduce the H-Line Pressurisation Units and Polyethylene Tanks that they manufacture to the UK. After reviewing some technical literature, we were impressed and needed to know more. Based in Töcksfors, Sweden, HL Hydronics have been manufacturing Pressurisation Units and distributing them across Scandinavia […]

Spill & Fill to Sealed System Conversion

Dilapidated Spill & Fill Setup This Spill & Fill unit had served the test of time as it was c.20 years old. It had only suffered failure due to age and obsolescence. This led to the pump vessel failing, which had a knock on effect and caused both pumps to fail. The tank was heavily […]

Booster Set Replacement – Birmingham City Centre

Complete Failure of 4-Pump Booster Set We were recently contacted by a new customer in Birmingham, as they had no water as their booster set had failed . This is a prestige 39-storey building spanning over 7,000 square feet, interruption to water at a building of this size had massive repercussions for thousands of people. […]

PressBoost Ltd Site Unify Platform

Recently, we began the process of moving our engineer reporting system over to a Site Unify Platform. Having seen the success of Double Zero Solutions work with Hydraclean Limited, who we work closely with, we decided to meet with Dave Broomhead of Double Zero to explore the potential options available to us. Dave and his […]

Variable Speed Panel Installations At Local Police HQ

Why did we replace the existing panels? We have carried out the annual maintenance of all the booster sets on site at a local police headquarters for the last 3 years. As part of this service programme we recommended to our customer retrofitting their fixed speed booster sets to variable speed to provide them with […]

Cold Water Booster Pump Sets

Why do you have poor water pressure? We often get asked by customers why they have poor water pressure and can we do anything to fix it. Firstly, we definitely can do something to fix this problem for you. Poor water pressure is largely down to the incoming pressure your utility company provide you with, […]