We recently installed this twin pump Mikrofill Maxi Plus Pressurisation Unit at a large University in Wales. The existing unit had a burnt out pump and caused and outage due to single point of failure. Therefore, we installed this tidy twin pump unit to provide...
University
RPZ Valve Replacements – Welsh University
Along with our core offering of pressure and booster maintenance, we also specialise in the test, commissioning and installation of RPZ Valves [BA devices]. Following annual testing of the valves pictured these 2x valves failed at this major Welsh university. Given...
North-West University PD-X Installation
PressBoost recently completed this installation at a large North-West university where an existing combined Pressurisation Unit was in need of replacing - the recently launched HL Hydronics PD-X combined Pressurisation Unit and Degasser proving the perfect upgrade as...
New HL Hydronics Product Installed at North-West University
We recently installed this new product from HL Hydronics at a major North-West university. HL Hyrdonics recently launched the PD-X combined Pressurisation Unit and Degasser which we recently tested on a visit to Sweden.Whilst completing a PPM visit at this university...
Mikrofill MAXI Installation – North West University
This Mikrofill Maxi and GWS Challenger vessel installation was carried out at a North West University as part of planned upgrade works on site. The existing analogue grundfos unit had come to end of life and was due for replacement. Mikrofill and GWS are the ideal...
H-Line Installation – South Wales University
We recently installed this new H-Line Pressurisation Unit at a University in South Wales. The existing unit was not a design we like, both pumps were U/S, NRVs failed and the spill type expansion vessel diaphragm had failed. Given the issues with the unit, this was...
University Pressure Unit For Chilled Water System
We recently attended a South Wales University to install a new Pressure Unit and Expansion Vessel on a chilled water system where the existing equipment had completely failed.The new Lowara Presfix Beta Pressurisation system and Global Water Solutions Expansion Vessel...
H-Line Installation Replacing Traditional Expansion Vessels
This University has been working with us for some time to manage its assets and strategically remove expansion vessels where possible when planned upgrade works are required. At this building, they had an old analogue Pressurisation Unit come up for replacement under...
H-Line Pressurisation Unit Installation – Salford
Looking to remove costly Expansion Vessels from your site? The H-Line is a fantastic, dynamic solution to Pressurisation that removes traditional expansion vessels from your system. This case study is a fantastic example as the existing installation was a standard...
Pressurisation Unit Installation – South Wales
We recently supplied and installed this Mikrofill Maxi Pressurisation unit and Global Water Solutions Expansion Vessel at a University in South Wales. This is one of a number of installations we have been carrying out across this site after a number of years of...
Mikrofill Maxi Pressurisation Unit Installation
New Twin Pump Mikrofill Maxi Pressurisation Unit Installation at a University in South Wales. Following our first service visit to this site we found the existing unit had failed completely and been bypassed by a quick filling loop. In addition the 2no. Expansion...
Twin H-Line and 02-X Vacuum Degasser Installation
PressBoost recently completed this installation at a large University. The existing unit had been problematic for a number of years. Site had been through parts for fun. With repair after repair, callout after callout. This is a large, dynamic system in an important...
University Tank and Booster Installation
This local university building was struggling on mains pressure to its roof tanks and then atmospheric fed down the building. PressBoost engineers installed two 1250 litre tanks and a twin pump Variable Speed Booster Set. We also converted/linked out the pipework in...
North West University Cat 5 Booster Set Installation
We recently completed this installation of a CAT 5 Booster Set and bib tap for a North West University. The only suitable installation location was in a bike store, so we fitted galvanised cage to protect the unit and prevent tampering. A great install from our lads...
Fixed Speed – Variable Speed Water Booster Set Conversion
The Project: We recently carried out a variable speed conversion of a cold water booster for a University in North West England. We were called in by the University to upgrade their archaic pump set and remove 2 steel cold water storage tanks. Replacing them with a...