by vardeadmin | May 30, 2022 | Hospital, Xylem / Lowara
Twin Pump Lowara SMB Install at North West Hospital The existing Teknospeed unit had been failing for some time and due to its obsolescence, replacement was the only suitable option.Another tidy installation from our engineers Ben Brown, Antony Chesters and Andy...
by vardeadmin | May 30, 2022 | Hospital, Uncategorized, Xylem / Lowara
Two Lowara Presfix Beta Installations at Local Hospital These two Lowara Presfix Beta installations at a local hospital were recently completed in one day by PressBoost engineer Andy...
by vardeadmin | May 17, 2022 | Hospital, Uncategorized
Twin Pump Booster set and Tank Installation – Hospital We recently installed a Twin-Pump Variable Speed Booster Set and a two-piece tank from Fluid Water Solutions at this North West hospital. Working for Pumpcare, we completed this installation through the...
by vardeadmin | May 5, 2022 | Uncategorized
Variable Speed Unit Installation – Liverpool Apartment Block This apartment block in Liverpool required a replacement to its fixed speed unit for a new variable speed one. The work required a wall to be removed due to the size of the motors, and the site now...
by vardeadmin | May 3, 2022 | Uncategorized
Booster Set Installation – Manchester Bar This Manchester bar had poor mains pressure and on a busy night ran out of flow to the toilets and kitchen.PressBoost engineers Antony and Andy had to come up with a solution which could fit into this tight area and keep...