A recent project at a school in the Greater Manchester area involved the replacement of a failing three-pump fixed-speed booster set. With the existing unit close to complete failure, the site required a rapid turnaround to restore consistent water supply. Our team...
School
HL Hydronics Unit Upgrade at North West Academy High School
PressBoost recently completed a major pressurisation upgrade at a large academy high school in the North West. The existing system had become increasingly unreliable, with multiple issues affecting performance—including a problematic pressure unit and four failed...
H-Line Installation – Liverpool School
A school in Liverpool has replaced its outdated pressure unit with a new H-Line spill and fill pressure unit.This modern system is 90% efficient in handling expansion, offering significant space savings. It also eliminates the need for written scheme insurance...
North West College – Booster Set Replacements
This college in the North West was new site for us, and we had to replace two old fixed speed units. One of the units had a failed pump and non-return valves causing the remaining working pump to run constantly even when no demand was present. PressBoost engineers Ben...
Knowsley – School H-Line Installs
We have been continuing our progress through a group of schools in Knowsley supplying and installing 2no. H-Line Units for their LTHW and CHW systems. These Energy Centres are really quite tight on space and as per previous installs we are having to install 2no. units...
Pressurisation Unit Installations – H-Line
Further building on our partnership with Equans, we have now completed the second installation at one of their schools in the North West. Similar to an installation completed at another high school recently this school had 1no. Pressurisation Unit feeding both the...
Stuart Turner MAB Booster Set Installation – North West
We installed this 3-pump MAB booster set a high school in the North West following the failure of the existing booster set. The existing booster set was Master/Slave and this school lost their master inverter. We quickly attended and restored water whilst quoting for...
Half Term Installation at North West School
Here at PressBoost we are often asked to complete works ‘Out of Hours’ or on specified dates. We are always happy to accommodate and work with the client towards a future deadline. A common preference for schools is that works are completed during Half Term. This half...
College Variable Speed Booster Unit Replacement
We were recently asked to this college to look at a problematic single pump booster. Upon attendance we found the pump had seized completely and given its small size a replacement would be most viable. However, on further inspection we found the accumulator vessel...
Variable Speed Booster Set Install – Knowsley School
Over the weekend PressBoost installed this 3-pump variable speed Stuart Turner Booster Set at a school in Knowsley. The existing set had a master inverter which had failed leaving the school with no water. The set was obsolete so as such the most suitable option was...
Lowara Pressure Unit replacement – Immingham School
This school in Immingham had a failed PCB board on an existing pressure unit which was obsolete. The new Lowara dual pump unit replaced the existing single pump unit so the site has backup now.Expertly installed by PressBoost engineers Antony and Ben.