Knowsley – School H-Line Installs We have been continuing our progress through a group of schools in Knowsley supplying and installing 2no. H-Line Units for their LTHW and CHW systems. These Energy Centres are really quite tight on space and as per previous...
Pressurisation Unit Installations – H-Line Further building on our partnership with Equans, we have now completed the second installation at one of their schools in the North West. Similar to an installation completed at another high school recently this school had...
Stuart Turner MAB Booster Set Installation – North West We installed this 3-pump MAB booster set a high school in the North West following the failure of the existing booster set. The existing booster set was Master/Slave and this school lost their master...
Half Term Installation at North West School Here at PressBoost we are often asked to complete works ‘Out of Hours’ or on specified dates. We are always happy to accommodate and work with the client towards a future deadline. A common preference for schools is that...
College Variable Speed Booster Unit Replacement We were recently asked to this college to look at a problematic single pump booster. Upon attendance we found the pump had seized completely and given its small size a replacement would be most viable. However, on...
Variable Speed Booster Set Install – Knowsley School Over the weekend PressBoost installed this 3-pump variable speed Stuart Turner Booster Set at a school in Knowsley. The existing set had a master inverter which had failed leaving the school with no water. The...